Yarn Separation
Dividing the glued sheet of warp yarns into individual strands after sizing and drying is necessary to prepare the warp beam for weaving. During this preparation stage, the lease rod split separates the yarns that have bonded together due to the dried sizing agent. This separation occurs as the yarn sheet passes over and under a series of metallic bars.
This action ensures that each yarn can move independently during the weaving process.
Mechanical Action
Splitting the sized warp sheet requires controlled tension to avoid damaging the protective coating on the yarns. The dried yarn sheet from the sizing machine is fed through a set of chrome plated lease rods. As the sheet meets each lease rod split, the individual yarns are forced apart, breaking the size bridges formed during the drying phase.
This mechanical cracking must be clean, as any residual fiber bonding will cause warp cling and yarn breaks on the loom. Operators record the tension settings and yarn breakage rates during this phase in the sizing machine log. If the splitting tension is set too high, the protective polymer film will peel off, creating excess dust and weakening the yarn.
Warp Quality
Achieving a clean division of the yarn sheet determines the subsequent efficiency of the weaving department. Quality inspectors check the warp yarn for skinning or fraying immediately after the lease rod split. These observations are logged in the warp preparation report, which is signed off before the warp beam is moved to the weaving room.
This process prevents tangled threads from reaching the high speed looms.